Belgravia Mews
Location
City of Westminster
Conservation Area
Adjacent to Belgravia and Royal Parks Conservation Areas
Construction Cost
£660,000
Area
420 sqm (4,500 sqft) NIA
A newly revealed vaulted ceiling with exposed historic trusses brings light and drama into this Victorian mews building in Belgravia. The palette for this dramatic transformation pairs buttercream coloured terrazzo with muted mustard walls and natural oak detailing to echo the existing building fabric.
Value added
Significant improvement in rental rates will be achieved, particularly on the first floor, where the existing suspended ceiling was removed and opened up to the double gable pitched roof. New timber frame, double-glazed heritage windows will also improve street presence and tenant appeal. Restoration of the existing terrazzo staircase and opening up the staircase enclosure with a glazed wall creates a dramatic new focus in the entrance hall, in a way that is cost-effective to the client yet impactful for prospective tenants.
Sustainability
The newly insulated pitched roof, paired with replacement double-glazed street front windows, will improve the thermal envelope, thereby reducing energy consumption. Operable rooflights will allow hot air to escape without the need for air-conditioning. The existing gas boiler is being removed to eliminate reliance on fossil fuels for heating.
Testimonial
“We have worked with 4SA to add value to a number of challenging heritage properties, including the Grade II listed buildings at 100 Pall Mall, 10 Grosvenor Place, and 1-17 Ulster Terrace, as well as this mews property in Belgravia.
With their knowledge of historic buildings, and their commitment to high-quality design, 4SA developed innovative design solutions that were granted listed building consent. 4SA are a realiable practice with a collaborative attitude, working seamlessly with us and letting agents to take onboard market-led design requirements throughout the process. Their ability to respond quickly on site to unexpected conditions also ensures that opportunities to add value are taken advantage of, and the project progresses smoothly through construction to a successful end product.”